New: AI-powered PoC generation for CMS-2567 surveys is live →
PoC360
← F-Tag Library
Resident Assessment42 CFR §483.21(a)

F0655Baseline Care Plan

F0655 requires the facility to develop and implement a baseline care plan within 48 hours of admission, summarizing the instructions needed to provide effective, person-centered care until the comprehensive care plan is completed.

Common Deficiency Examples

  • Baseline care plan not completed within the required 48-hour window
  • Baseline care plan missing key elements (initial goals, physician orders, dietary needs)
  • Resident/representative not provided a summary of the baseline care plan
  • Baseline plan not actually followed by staff during the initial care period

What Your Plan of Correction Needs

F0655 PoCs are largely about admission-process timing discipline:

Gap identifiedspecific timing or content gap in the baseline plan
Immediate actionbaseline plan completed/corrected for the resident in question
Systemic fixadmission workflow ensuring the 48-hour requirement is tracked and met
Monitoring planadmission timeline audits confirming baseline plan completion
See the four required elements of every Plan of Correction →

Cited on F0655? PoC360 generates your Plan of Correction instantly.

Import your CMS-2567 and get a complete PoC draft for every F-tag — corrective action, systemic fix, monitoring plan, and completion date.