A performance improvement project (PIP) is the working part of QAPI: a focused, data-driven effort to fix a specific clinical or operational problem. This guide covers the federal requirement, how to pick a topic, seven steps to run the project, a worked fall-reduction example, and a charter template.

14 min read·By PoC360 Team·Last updated 2026-11-25

Quick answer

A performance improvement project in a nursing home is a team-run, data-driven project that tests changes to fix an underlying problem and tracks whether results are sustained. Federal rule 42 CFR 483.75(e)(3) requires facilities to run distinct PIPs, with at least one each year on a high-risk or problem-prone area found through their own data. Surveyors review PIPs under tag F867.

General information only. This guide explains public CMS guidance for educational purposes. The fall-reduction example uses invented numbers for illustration. CMS states its QAPI tools are not mandated and that using them does not ensure regulatory compliance. It is not legal advice.

What Is a Performance Improvement Project (PIP) in a Nursing Home?

A performance improvement project is a team effort, sustained over time, to improve a systemic problem or raise quality where no problem has been found. CMS’s Appendix PP guidance says PIPs often need a root cause analysis, interventions that target the underlying causes, and close monitoring of results.

The requirement is in 42 CFR 483.75(e)(3). Facilities must conduct distinct PIPs, in a number and frequency that reflect their services and resources as shown in the facility assessment. At least one project each year must focus on a high-risk or problem-prone area identified through data collection and analysis.

On a survey, PIPs are reviewed under F867, which covers how a facility uses feedback and data, monitors adverse events, prioritizes improvement activities, implements corrective and preventive actions, and conducts PIPs. F865 covers the QAPI program and plan, and F868 covers the QAA committee. The wider program is explained in QAPI for nursing homes.

Quality Assurance vs Performance Improvement: What Is the Difference?

Quality assurance (QA) sets standards and checks that care stays at acceptable levels against them, while performance improvement (PI) continuously studies processes to improve services or outcomes and prevent problems. CMS defines QAPI as the two working together, each reinforcing the other.

Quality assurancePerformance improvement
Core questionAre we meeting our standards of care and service?How do we make a process work better, or prevent a recurring problem?
TimingOngoing; looks ahead and looks back at performance.Continuous study of processes, often run as a time-limited project.
Typical activityMonitoring against specified standards and thresholds.Finding underlying causes and testing new approaches.
ResultCare maintained at acceptable levels against the standard.Better outcomes or services, and fewer problems.

Some sources describe QA as reactive and PI as proactive. CMS’s wording is that QA is both anticipatory and retrospective, so treat the contrast as emphasis, not a rule. A QA check that finds a recurring gap is often what triggers a PIP.

How to Choose a Nursing Home PIP Topic From Your Data

Choose a PIP topic by looking across your data for areas that are high-risk, high-volume, or problem-prone, then weighing how often the problem occurs, how widespread it is, and how severe. The regulation requires priorities that affect health outcomes, resident safety, autonomy, choice, and quality of care.

TermMeaning in Appendix PPExamples CMS gives
High-riskCare or service areas where errors can cause pain, suffering, or death.Tracheostomy care, pressure injury prevention, high-risk medications such as anticoagulants, insulin, and opioids
High-volumeAreas performed frequently or affecting many residents, which widens the scope of any problem.Transcription of orders, medication administration, laboratory testing
Problem-proneAreas that have historically had repeated problems.Call bell response times, staff turnover, lost laundry

The data that should feed the choice come from every department, not only nursing:

  • Adverse events and incidents. Falls, medication errors, and injuries tracked under your adverse event policy show where harm is clustering.
  • Quality measures. Your quality measure results against state and national benchmarks flag outcomes worth improving.
  • Survey findings. Citations and repeat F-tags on your last surveys show where the system has already failed once.
  • Staff, resident, and family feedback. The regulation requires systems to gather and use this feedback to find high-risk, high-volume, or problem-prone issues.
  • Facility assessment. The facility assessment sets the scope of your services and resources, which CMS says should shape how many projects you run.

Repeat citations are a good signal; see predicting repeat F-tags and the most-cited F-tags.

How to Prioritize PIPs: Scoring Worksheet

To prioritize PIPs, list your candidate topics, score each from 1 (very low) to 5 (very high) on seven criteria, and add the scores across each row. Topics with higher totals rank as higher priority. CMS publishes this method as a worksheet and says the ratings are subjective and meant to prompt discussion.

CriterionWhat you are rating
PrevalenceHow often the issue arises in your organization.
RiskHow much the issue threatens the well-being of residents.
CostThe cost your organization incurs each time the issue occurs.
RelevanceHow far addressing the issue would affect resident quality of life or quality of care.
ResponsivenessHow likely an initiative on the issue is to meet a need residents, families, or staff have expressed.
FeasibilityYour organization's ability to carry out a PIP on the issue with current resources.
ContinuityHow well an initiative on the issue would support your organizational goals and priorities.

CMS also lists six additional factors to weigh alongside the score. They do not add points, but they help the QAPI team decide between topics with similar totals.

  • Standards: what existing standards or guidelines could direct the work.
  • Measures: what measures could monitor progress.
  • Public reporting: whether the topic is publicly reported on Care Compare or tied to a national quality campaign.
  • Type of change: whether the changes would mainly be to systems, the environment, or staffing.
  • Staff affected: which staff would be most affected and what training they would need.
  • Champion: whether someone is ready to champion the initiative.

Worked scoring example with three illustrative topics

The scores below are invented to show the arithmetic, not data from any facility. Each topic is rated 1 to 5 on the seven criteria and the row is totaled. In this illustration falls rank first, but your own data and discussion should decide the ratings.

TopicPrevalenceRiskCostRelevanceResponsivenessFeasibilityContinuityTotal
Falls on one unit554544431
Call bell response times422455325
Unplanned weight loss343433424

Use the CMS Prioritization Worksheet for Performance Improvement Projects (checked 2026-11-25). CMS states that its use is not mandated and does not ensure regulatory compliance. The worksheet still mentions Nursing Home Compare, which CMS retired on December 1, 2020; the same information is now on Care Compare.

Is a PIP the same as a performance improvement plan?

In a nursing home, PIP means a performance improvement project, a defined effort under 42 CFR 483.75(e)(3) with its own goal, team, and timetable. Some publishers write "performance improvement plan" for the same thing. An HR performance improvement plan for an employee is a different, unrelated document.

Common Nursing Home PIP Focus Areas

Common nursing home PIP focus areas include falls, pressure injuries, medication administration, infections, avoidable hospital readmissions, call bell response, and staff turnover. CMS names several of these as examples of high-risk, high-volume, or problem-prone areas, but your own data should decide which one comes first.

Focus areaWhy it is a common choice
Falls with or without injuryHigh-volume and high-risk; the worked example below uses it.
Pressure injury preventionNamed by CMS as an example of a high-risk area.
Medication administration and high-risk medicationsNamed by CMS as examples of high-volume and high-risk areas.
Urinary tract and other infectionsInfection data comes to the QAA committee through the infection preventionist.
Avoidable hospital readmissionsA discharge and transition problem that crosses departments.
Call bell response and staff turnoverNamed by CMS as examples of problem-prone areas.

Infection-related projects work closely with the infection preventionist, who must report to the QAA committee.

Key Steps to Run a Nursing Home PIP

Running a nursing home PIP takes seven steps: choose the topic from data, write a charter with a measurable aim, build the team, measure the baseline and find root causes, test changes with PDSA cycles, report to the QAA committee, and sustain the gain. The steps follow CMS’s charter and RCA guidance.

1. Choose the topic from your own data

Choosing a PIP topic means using your data to find a high-risk, high-volume, or problem-prone area. The regulation tells facilities to set priorities that consider incidence, prevalence, and severity, and to run at least one project a year on an area identified through data collection and analysis.

  • Rank by risk. Compare candidate topics on how often they occur and how badly they can hurt residents.
  • Pick one specific problem. A narrow topic such as falls on one unit is easier to measure than “resident safety.”

2. Write a charter with a measurable aim

A PIP charter sets the goals, scope, timing, milestones, and team roles for the project. CMS describes the charter as telling the team what to accomplish rather than how, and its worksheet asks for the problem, background, goal, scope, timetable, team, resources, and barriers.

  • State the aim in numbers. Name the measure, the target, the unit or population, and the end date.
  • Set the boundary. Say where the project starts and stops so the team does not chase every related problem.

3. Build the team and name a sponsor

Building the PIP team means choosing a sponsor, a director, a project manager, and members who work in the process being changed. CMS’s charter worksheet lists those roles, and notes that members are usually chosen for interest, involvement in the process, and availability.

  • Include front-line staff. People who do the work see the barriers a committee room does not.
  • Keep leadership visible. The administrator signs the charter, which shows the QAA committee backs the project.

4. Measure the baseline and find root causes

Measuring the baseline records current performance before any change, so improvement can be shown later. Root cause analysis then explains why the problem happens. Appendix PP says PIPs often require a systematic investigation such as a root cause analysis to identify underlying causes.

  • Capture the baseline first. Collect at least a few weeks or months of data on the same measure you will track later.
  • Use RCA on the cases. Our guide to root cause analysis shows the 5 Whys and fishbone methods.

5. Test changes with PDSA cycles

A Plan-Do-Study-Act cycle tests a change on a small scale before it is rolled out. The team plans the change and prediction, tries it, studies the data against the baseline, then adopts, adapts, or abandons it. Appendix PP says corrective actions may take the form of one or more PDSA cycles.

  • Start small. Pilot on one unit or shift so a failed idea costs little.
  • Compare to the baseline. The Study step asks whether the result moved toward the aim, not whether staff liked the change.

6. Report to the QAA committee and monitor

Reporting to the QAA committee keeps the PIP accountable to leadership. The committee must meet at least quarterly, and CMS guidance says it should develop action plans for identified quality deficiencies and monitor that performance goals are achieved, revising corrective action when necessary.

  • Put results on the agenda. Show the run chart, not just a summary, every meeting.
  • Record decisions in minutes. Minutes that show review and action are the evidence of an operating QAA process.

7. Sustain the gain and close the project

Sustaining the gain means keeping results from sliding after the project team disbands. The regulation requires facilities to track performance so improvements are realized and sustained, and CMS’s charter timeline ends with a closing phase and a written summary report.

  • Embed the change. Update policies, care plan templates, or workflows so the new way is the default.
  • Keep monitoring at a lower frequency. Assign an owner to keep checking the measure and bring any slip back to the committee.

For the analysis step in detail, read root cause analysis in a nursing home. For how the same cycle runs inside PoC360, see the QAPI PIP cycle guide.

A PIP Charter Template for Nursing Homes

A PIP charter template for a nursing home covers the project name, problem, background, goal, scope, timetable, team, resources, barriers, and approvals. The fields below follow the headings on CMS’s Worksheet to Create a Performance Improvement Project Charter, which you can copy into your own format.

Charter fieldWhat to write
Name of projectA short, specific title.
Problem to be solvedThe gap or harm the project addresses.
BackgroundWhat led to the need, with references to supporting documents.
Goal(s)Measurable target and date.
ScopeWhere the project begins and ends.
TimetableStart and end dates for initiation, planning, implementation, monitoring, and closing.
Team and responsibilitiesProject sponsor, director, manager, and members, with the person assigned to each.
Material resourcesEquipment, software, and supplies needed.
BarriersWhat could get in the way, and what you will do about it.
ApprovalSignatures and dates for the administrator, sponsor, director, and manager as applicable.

Read CMS’s original in the PIP charter worksheet (PDF). CMS notes that the charter tells the team what to accomplish, not how.

Worked Example: A Fall-Reduction PIP (Illustrative)

A fall-reduction PIP example shows how the pieces fit together: a measurable aim, a baseline, root-cause-based interventions, PDSA testing, a data plan, and sustainment. Every number below is invented for illustration, so replace them with your own facility’s data.

ElementIllustrative content
ProblemUnit 2 had 9 resident falls in the last three months, mostly between 5:00 and 7:00 a.m.
Baseline9 falls across about 3,640 resident days, or roughly 2.5 falls per 1,000 resident days.
AimReduce Unit 2 falls to 1.9 or fewer per 1,000 resident days, a 25% reduction, within six months of the start date.
Root cause (from RCA)No process turns night-shift observations about toileting patterns into care plan changes between scheduled reviews.
InterventionsWritten early-morning toileting schedules for residents at highest risk; a trigger to review the care plan after any near fall; call lights checked at every round.
PDSA cycle 1Plan: schedule for 8 residents for four weeks. Do: staff follow it. Study: compare falls and schedule completion with baseline. Act: expand, adapt, or drop.
Process measurePercent of scheduled early-morning toileting rounds completed, audited weekly on a sample, with a target set in the charter.
Outcome measureFalls per 1,000 resident days, plotted monthly against the baseline and the aim.
Balancing measureResident complaints about night-time waking, so the fix does not create a new problem.
Data planIncident reports and the toileting audit feed one monthly chart; the project manager presents it to the QAA committee.
SustainmentAdd the toileting schedule and near-fall trigger to the standard care plan workflow, then audit monthly after the project closes.

The same unwitnessed-fall case is analyzed step by step in our root cause analysis examples. A project like this also supplies the monitoring plan a plan of correction requires.

What Surveyors Look For in a Nursing Home PIP

Surveyors reviewing a nursing home PIP look for evidence under F867 that the facility prioritized high-risk areas, analyzed causes, implemented action plans through the QAA committee, measured results, and sustained them. They also check the committee’s makeup and meeting frequency under F868, using the QAPI facility task pathway.

What surveyors testEvidence to have ready
A PIP exists and was chosen from dataCharter citing the data that led to the topic; at least one project per year on a high-risk or problem-prone area.
Priorities focus on high-risk, high-volume, or problem-prone areasA ranked list or inventory of improvement opportunities with the reasoning.
Underlying causes were analyzedRoot cause analysis, timeline, or fishbone attached to the project file.
The QAA committee developed and implemented action plansMinutes showing the plan was approved, assigned, and revisited.
Success was measured and trackedBaseline, run chart, and follow-up data over time, not a single snapshot.
Monitoring happened as plannedDated audit sheets for every month the plan said monitoring would occur.

Severity depends on harm. Appendix PP’s examples range from a missed monitoring month at the lowest level to a QAA committee unaware of a high-risk, systemic problem at the Immediate Jeopardy level. See Immediate Jeopardy citations and the mock survey guide.

Common Nursing Home PIP Mistakes

The most common nursing home PIP mistakes are starting with the solution, choosing a topic that is too broad, skipping the baseline, relying on training alone, letting monitoring lapse, and never presenting the project to the QAA committee. Each weakens the evidence a surveyor reviews.

  • Starting with the solution. Buying equipment or writing a policy before a baseline and root cause leaves nothing to prove it worked.
  • A topic that is too broad. “Reduce falls” across every unit is hard to measure; scope it to a unit, shift, or resident group.
  • No baseline. Without pre-project data, a lower number later cannot be credited to the project.
  • Training as the whole plan. Education alone rarely changes a process, and it fades with turnover.
  • Monitoring that stops. CMS gives an example of a corrective action with three months of planned monitoring where the second month was missing.
  • Committee never sees it. A PIP the QAA committee does not review leaves no evidence of governance.

A QAPI role helps avoid these; see the QAPI coordinator job description.

Tools for Running and Documenting PIPs

PIPs can be documented in CMS’s free worksheets, a spreadsheet, or software, so long as the charter, baseline, data, and committee review stay together and are dated. The test is whether a surveyor can follow the project from topic to sustained result without reconstructing it.

Run PIPs inside PoC360

PoC360’s QAPI Module lets facilities run structured Performance Improvement Projects and PDSA cycles, document root cause analyses, track interventions, and produce QAPI evidence for survey. If you are comparing tools, start with our QA and QAPI software guide.

Sign up for PoC360 →

Official Sources on Nursing Home PIPs

The official sources on nursing home performance improvement projects are the QAPI regulation at 42 CFR 483.75, the interpretive guidance for F865, F867, and F868 in Appendix PP, and CMS’s QAPI resources, including its PIP charter worksheet.

Frequently Asked Questions About Nursing Home PIPs

The questions below cover what administrators and QAPI leads most often ask about performance improvement projects, including the requirement, the F-tag, team roles, and how a PIP differs from a plan of correction.

What is a performance improvement project in a nursing home?+

A performance improvement project, or PIP, is a team effort over time to improve a systemic problem or raise quality where no problem exists. CMS Appendix PP describes it as a concentrated effort with a charter, root cause analysis where needed, interventions aimed at underlying causes, and close monitoring of results.

Does CMS require nursing homes to run PIPs?+

Yes. Under 42 CFR 483.75(e)(3), facilities must conduct distinct performance improvement projects. The number and frequency reflect the facility’s services and resources, as shown in its facility assessment, but at least one project each year must focus on a high-risk or problem-prone area identified through the facility’s own data collection and analysis.

Which F-tag covers performance improvement projects?+

F867 covers performance improvement projects in Appendix PP, along with feedback, data, adverse event monitoring, and corrective action. F865 covers the QAPI program and plan, and F868 covers the QAA committee. The former F866 requirements were relocated into F867, so a PIP citation points to F867.

What is the difference between QA and PI?+

Quality assurance sets standards and checks that care stays at acceptable levels against them. Performance improvement is the continuous study of processes to improve services or outcomes and prevent problems, by finding and fixing underlying causes. CMS defines QAPI as the two working together, and each reinforces the other.

How many PIPs does a nursing home need?+

The regulation sets no fixed number beyond a minimum of one project a year on a high-risk or problem-prone area. How many projects a facility runs should reflect its scope, complexity, and resources, as shown by its facility assessment. A larger or higher-acuity facility is expected to run more than a small one.

How long should a PIP last?+

Neither the regulation nor CMS sets a required length. The project charter defines the timetable, with phases for initiation, planning, implementation, monitoring, and closing. Most teams run PDSA test cycles of a few weeks, then keep monitoring after the project closes, because the regulation requires that improvements be sustained.

Who should be on a PIP team?+

CMS’s charter worksheet lists a project sponsor, a project director, a project manager, and team members, with the administrator signing approval. Members are normally people involved in the process being changed. The QAA committee, which includes the director of nursing, the Medical Director or designee, and the infection preventionist, oversees the project.

Is a PIP the same as a performance improvement plan?+

In nursing homes, PIP stands for performance improvement project, the defined effort required by 42 CFR 483.75(e)(3), with a charter, a team, and a timetable. Some publishers write performance improvement plan for the same thing. An HR performance improvement plan, used to manage an employee's performance, is a different document and is not part of QAPI.

Is a PIP the same as a plan of correction?+

No. A plan of correction is the formal written response to cited survey deficiencies. A PIP is a QAPI project the facility chooses from its own data. Appendix PP says QAPI corrective action is not synonymous with a plan of correction, though a PIP can be a strong way to deliver the systemic fix a plan promises.

Is the CMS PIP charter worksheet mandatory?+

No. CMS publishes the worksheet as a tool, with a disclaimer that its use is not mandated by CMS and that completing it does not ensure regulatory compliance. Facilities can use their own format, as long as the project documents its goal, scope, team, timeline, and monitoring clearly enough to show a surveyor.

Sources: 42 CFR 483.75; CMS State Operations Manual Appendix PP, F865, F867, F868 (Appendix PP Rev. 232, issued 07-23-25; F865 last revised Rev. 211, F867 Rev. 229, F868 Rev. 225; Rev. 232 confirmed as the latest Appendix PP revision 2026-11-25); CMS Prioritization Worksheet for Performance Improvement Projects (checked 2026-11-25); CMS Worksheet to Create a Performance Improvement Project Charter; CMS Guidance for Performing Root Cause Analysis with PIPs. The worked example is illustrative with invented numbers. This article is general information, not legal advice. Last reviewed 2026-11-25.