Fictional example
A worked Plan of Correction, start to finish.
Two citations from a made-up facility, each with the four fields filled in: corrective action, systemic fix, monitoring plan and completion date.
Fictional facility created for illustration. It is not a real facility, and any resemblance to a real facility is coincidental. This is a teaching example, not legal or clinical advice, and not text to submit as written.
01Maple Ridge Care Center, fictional
F686 Treatment/Services to Prevent/Heal Pressure Ulcer
Based on observation, record review and staff interview, the facility failed to ensure that a resident at risk for pressure injury received repositioning as specified in the care plan. Resident 4 was observed in the same position during two observations approximately two hours apart, and the care plan called for repositioning every two hours. Resident 4 had a stage 2 pressure injury identified on the sacrum.
- Corrective action
- Resident 4 was reassessed by the wound nurse and the care plan was updated with a written repositioning schedule and an appropriate support surface. All other residents with a pressure injury or a high risk score were reviewed by the DON and unit managers, and any resident without a current repositioning plan received one.
- Systemic fix
- Repositioning is now a standing item at each shift huddle, and the turning schedule is posted at the point of care. Nursing staff were retrained on the repositioning procedure and on documenting it. The pressure injury risk assessment policy was reviewed and reissued.
- Monitoring plan
- The DON or designee audits repositioning on every unit once a week, covering a sample of at-risk residents across all shifts. Results go to the QAPI committee monthly. Audits continue until the committee agrees compliance is sustained, then move to a quarterly check.
- Completion date
- 2026-04-10 (example date)
02Maple Ridge Care Center, fictional
F880 Infection Prevention and Control
Based on observation and staff interview, the facility failed to ensure staff followed hand hygiene practices during care. A nursing assistant was observed to provide care to one resident and then care for a second resident without performing hand hygiene between the two.
- Corrective action
- The staff member was coached immediately and completed hand hygiene competency validation. The infection preventionist reviewed whether the residents involved showed any signs of infection and found none requiring follow-up.
- Systemic fix
- All direct-care staff will complete hand hygiene training and competency validation. Hand hygiene supplies were checked at every point of care and restocked where needed. The infection prevention policy was reviewed against current guidance.
- Monitoring plan
- The infection preventionist performs hand hygiene observations on each unit weekly across all shifts, using the facility audit tool. Findings are reported to the QAPI committee monthly until the committee agrees compliance is sustained.
- Completion date
- 2026-04-03 (example date)
03Checklist
First 48 hours after a CMS-2567 arrives
A general working checklist for healthcare facility teams. Your notice letter and the instructions from your state survey agency or CMS control. Confirm every date against the letter, not this page.
First hour
- Record the date and time the CMS-2567 was received and who sent it.
- Save the full statement of deficiencies and the cover or notice letter together. Do not edit the originals.
- Read the notice letter for response dates and any enforcement remedies. Write every date in one shared place.
- Tell the administrator, Director of Nursing, medical director and your ownership or corporate contact.
Same day
- List every F-tag with its scope and severity letter. Mark any J, K or L (immediate jeopardy).
- For any immediate jeopardy citation, check what the notice says about removal and next steps, and escalate to leadership and counsel.
- Name one accountable owner for each F-tag.
- Confirm that safety measures are in place now for any resident named in a citation.
- Preserve evidence as it stands: logs, schedules, policies, training records and audit tools.
Within 48 hours
- Draft the four fields for each F-tag: corrective action, systemic fix, monitoring plan and completion date.
- Schedule a clinical review of each draft with the DON, medical director and QAPI lead.
- If your notice offers informal dispute resolution, note its deadline from the letter and decide who will decide.
- Ask counsel or your advisers about any enforcement remedy named in the letter.
- Turn each corrective action into a task with an owner and a due date.
- Plan the QAPI committee review of the plan and of monitoring results.
04Your own plan
Ready to write yours?
Start from your own CMS-2567. Drafts are for your clinical team to review and edit.