New: AI-powered PoC generation for CMS-2567 surveys is live →
Book a demoStart free trial
Resources›QAPI Plan Template for Nursing Homes
Improvement

QAPI Plan Template for Nursing Homes: A Section-by-Section Outline With Sample Wording

The written QAPI plan is the document a surveyor asks for first. This guide gives an administrator an eight-section template mapped to 42 CFR 483.75, sample wording for each section, a QAA committee agenda, the F865, F867, and F868 checks, and how the plan differs from a PIP charter.

15 min read·By PoC360 Team·Last updated 2026-11-25

Quick answer

A QAPI plan template for a nursing home is a written outline covering purpose and scope, governance, feedback and data systems, performance improvement projects, systematic analysis, the QAA committee, documentation, and annual review. Facilities must present the plan to surveyors at each annual recertification survey under 42 CFR 483.75(a)(3). Surveyors review it under F865, F867, and F868.

General information only. This guide explains public CMS guidance for educational purposes. The sample wording is our own illustration of the structure in CMS’s QAPI Written Plan How-To Guide, which CMS says is not mandatory and does not guarantee compliance. Replace bracketed text with your own facts. It is not legal advice.

Which plan is this?

This page covers the nursing home QAPI plan and its performance improvement projects under 42 CFR 483.75. It is not an HR performance improvement plan for an employee. It is also not the home health QAPI condition at 42 CFR 484.65 or the hospital QAPI condition at 42 CFR 482.21, which have their own requirements.

What the Regulation Requires for a Written QAPI Plan

A nursing home must develop, implement, and maintain a data-driven QAPI program and must present its QAPI plan to a State Survey Agency or Federal surveyor at each annual recertification survey. Appendix PP defines the plan as the written process guiding efforts to keep care at acceptable levels and improve it continually.

One citation correction is worth making. The presentation duty sits in 42 CFR 483.75(a)(3). Paragraph (a)(2) was a one-time requirement to present the plan to the State Survey Agency within a year of the rule, and paragraph (e) covers program activities such as priorities and PIPs, not the plan document.

Appendix PP adds that the plan should describe the committee’s scope and process for finding and correcting quality deficiencies: tracking and measuring performance, setting goals and thresholds, prioritizing and analyzing deficiencies, acting, and checking that actions worked. For the wider program, read QAPI for nursing homes.

QAPI Plan vs PIP Charter: How They Differ

A QAPI plan describes how the whole quality program runs across the facility, while a PIP charter defines one improvement project with its own goal, scope, timetable, and team. The plan sets the rules for choosing and chartering projects, and every charter then operates within those rules.

QAPI written planPIP charter
What it isThe written plan describing the process that guides the whole QAPI program.A one-project document that sets goals, scope, timing, milestones, and team roles for a single PIP.
BasisAppendix PP says the facility is required to develop a QAPI plan; 42 CFR 483.75(a)(3) requires presenting it to surveyors.A CMS worksheet. CMS states its use is not mandated and completing it does not ensure compliance.
ScopeEvery system of care and management practice, tailored to the facility assessment.One problem on one unit, process, or population, with a start and an end.
Written byThe facility, usually through the QAA committee, with governing body oversight.Typically the QAPI team, then handed to the PIP team that carries out the work.
LifespanA living document the CMS guide says should be reviewed at least annually.Ends when the project closes with a summary report.
Survey usePresented at each annual recertification survey and on request.Shown as evidence for a PIP under F867 if asked.

For a charter template and a worked fall-reduction example, see performance improvement projects in nursing homes and the QAPI PIP cycle guide.

QAPI Plan Template: Eight Sections You Can Copy

The template below has eight sections that follow 42 CFR 483.75 and the numbered sections of CMS’s QAPI Written Plan How-To Guide. Each section lists what to include and a filled-in example paragraph. Copy the structure, replace the bracketed text, and keep only commitments your team will keep.

1. Purpose and Scope

The purpose and scope section states why the facility has a QAPI plan, who reviews it, and which services it covers. The regulation requires a program that is ongoing, comprehensive, and addresses the full range of care and services, so list every service line named in your facility assessment.

Source: 42 CFR 483.75(a) and (b)

  • Purpose statement. The goals the plan serves and how QAPI fits the facility’s mission. The CMS how-to guide says mission, vision, and guiding values are not required for compliance but can help.
  • Plan owner and review cycle. Who reviews the plan, how often, and how revisions reach staff, residents, and the governing body.
  • Services covered. Every unit, program, and department. Appendix PP says to tailor the plan to the specific units, programs, departments, and population identified in the facility assessment.
  • Key issues addressed. Clinical care, quality of life, resident choice, and management practices such as admissions, discharges, and resident funds, as the CMS guide lists them.

Example wording (illustrative)

[Facility Name]’s QAPI plan guides how we keep care and services at acceptable levels of performance and improve them continually. It covers all systems of care and management practices, including clinical care, quality of life, and resident choice, across every unit and department listed in our facility assessment: long-term care, short-stay rehabilitation, memory care, dietary, environmental services, and business office. The administrator ensures the QAA committee reviews this plan at least annually and after any change in services or resident population.

2. Governance and Leadership

The governance section names who is accountable for QAPI and how leadership keeps it running. Paragraph (f) makes the governing body or executive leadership responsible for a defined and sustained program, adequate resources, evaluated corrective actions, and clear expectations around safety, quality, rights, choice, and respect.

Source: 42 CFR 483.75(f)

  • Accountable person or group. Name the governing body or the person who functions as one, and what it reviews and how often.
  • Resources. Paragraph (f)(3) lists staff time, equipment, and technical training as examples of adequate resourcing.
  • Continuity. How the program continues through turnover in leadership and staffing, which (f)(2) requires.
  • Culture and training. The CMS guide suggests describing a fair and just culture for reporting errors and near misses, and QAPI training at orientation and annually.

Example wording (illustrative)

The governing body is accountable for ensuring [Facility Name]’s QAPI program is defined, implemented, and sustained through changes in leadership and staffing. The administrator reports QAPI activity to the governing body at least quarterly and secures the staff time, equipment, and training the program needs. Leadership sets clear expectations for safety, quality, rights, choice, and respect, and responds to staff who report errors and near misses in a way that encourages further reporting.

3. Feedback, Data Systems, and Monitoring

The feedback and data section is the one the regulation says must be written as policies and procedures. Paragraph (c) requires written policies for gathering feedback, collecting data, and monitoring, including adverse event monitoring, so state the data sources, the indicators, and how often each is reviewed and by whom.

Source: 42 CFR 483.75(c)

  • Feedback systems. How input from direct care staff, other staff, residents, and resident representatives is gathered and used to find high-risk, high-volume, or problem-prone issues, per (c)(1).
  • Data from all departments. Including the facility assessment under 42 CFR 483.71, and how it feeds performance indicators, per (c)(2).
  • Performance indicators. The methodology and frequency for developing, monitoring, and evaluating each indicator, per (c)(3).
  • Adverse event monitoring. How events are identified, reported, tracked, investigated, and analyzed, and how that data drives prevention, per (c)(4).
  • Data table. The CMS guide uses columns for data source, collection frequency, benchmark, who analyzes it, analysis frequency, and who receives the results. Adopt that grid and fill in your own rows.

Example wording (illustrative)

[Facility Name] gathers feedback through resident council, family contacts, grievance logs, and staff reports, and the QAA committee reviews it monthly to identify high-risk, high-volume, or problem-prone issues. Data from every department, including the facility assessment, feeds the performance indicators listed in Attachment A. Each indicator has an owner, a benchmark, and a review frequency. Adverse events are reported through the incident system, tracked in a log, investigated, analyzed for patterns, and used to design preventive actions.

4. Performance Improvement Projects

The PIP section sets out how the facility picks, charters, staffs, and reports on projects. Paragraph (e) requires priorities focused on high-risk, high-volume, or problem-prone areas and distinct projects sized to the facility assessment, with at least one project each year on a high-risk or problem-prone area found through data.

Source: 42 CFR 483.75(e)

  • Topic selection. How the committee reviews data and input to choose topics, and the criteria for ranking them: incidence, prevalence, severity, and effect on outcomes, safety, autonomy, and choice.
  • Charter. When a charter is written and by whom. Link to the CMS charter worksheet or your own form.
  • Team and sponsor. How teams are formed, who leads them, and how direct care staff are released to take part.
  • Tracking and reporting. How progress is documented, shown to the QAA committee, and kept after the project closes.

Example wording (illustrative)

The QAA committee reviews indicator data and feedback each month to identify PIP topics, prioritizing high-risk, high-volume, and problem-prone areas by incidence, prevalence, and severity. The facility conducts at least one PIP each year on a high-risk or problem-prone area identified through its own data. Each PIP begins with a written charter approved by the administrator, uses a cross-department team that includes direct care staff, tests changes with Plan-Do-Study-Act cycles, and reports to the QAA committee at every meeting until closed.

5. Systematic Analysis and Systemic Action

The systemic action section explains how the facility finds root causes and fixes systems instead of individual mistakes. Paragraph (d) requires policies on a systematic approach to underlying causes, corrective actions designed to change systems, and monitoring that confirms improvements are realized and sustained after the actions are in place.

Source: 42 CFR 483.75(d)

  • Root cause method. Name the methods used. The CMS guide lists Five Whys, flowcharting, fishbone diagrams, and failure mode and effects analysis.
  • Trigger for in-depth analysis. State what sets one off, such as an adverse event, a repeat citation, or an indicator past its threshold.
  • Systems-level action. How corrective action is designed to change the system, such as updated policies, defined roles, and orientation content.
  • Sustainment monitoring. Which measures are tracked after implementation, how often, and who acts if results slip.

Example wording (illustrative)

When an adverse event, repeat citation, or indicator outside its threshold suggests a systems problem, the QAA committee assigns a root cause analysis using Five Whys, flowcharting, or a fishbone diagram. Corrective actions target the system, such as policies, roles, staffing patterns, and training content, not only the individuals involved. Each action has a measure tied to it, reviewed on a set schedule, and the committee revises the action if results are not sustained.

6. QAA Committee: Membership, Meetings, and Reporting

The committee section lists who sits on the quality assessment and assurance committee, how often it meets, and how it reports. Paragraph (g) requires the director of nursing, the Medical Director or designee, an infection preventionist, and at least three other staff, one in a leadership role, meeting at least quarterly.

Source: 42 CFR 483.75(g)

  • Required members. Director of nursing services; Medical Director or designee; infection preventionist; at least three other staff, at least one being the administrator, owner, a board member, or another leader.
  • Medical Director designee. Appendix PP says the designee must not be another required member, such as the DON, and the Medical Director must still acknowledge meeting content.
  • Meeting frequency. At least quarterly and as needed. Many facilities commit to monthly; pick a cadence you will actually keep.
  • Duties. Coordinate and evaluate QAPI activities, develop and implement plans of action for quality deficiencies, and regularly review and analyze data, including drug regimen review data.
  • Reporting line. Report to the governing body, or the designated person functioning as one, about its activities and QAPI implementation.

Example wording (illustrative)

The QAA committee consists of the director of nursing, the Medical Director, the infection preventionist, the administrator, and [two or more additional named roles]. The Medical Director’s designee, if used, is a qualified practitioner who is not another required member. The committee meets monthly, and at least quarterly in all cases, and as needed for urgent issues. It reviews data, including drug regimen review results, develops action plans for identified quality deficiencies, and reports to the governing body after each meeting.

7. Documentation, Disclosure, and Availability to Surveyors

The disclosure section says what documentation proves the program is operating and when it is shown to surveyors. The regulation requires presenting the plan at each annual recertification survey and on request during other surveys, and presenting evidence of implementation on request, while limiting disclosure of committee records to what shows compliance.

Source: 42 CFR 483.75(a)(1), (a)(3), (a)(4), (h), (i)

  • Plan availability. State where the current plan is kept and who hands it to the survey team.
  • Evidence of implementation. Reports on adverse events, data analysis at regular intervals, and documentation of corrective actions and PIPs, as Appendix PP lists them.
  • Disclosure limit. Under (h) records of the committee are disclosed only so far as related to its compliance. Appendix PP says minutes can still be reviewed if they hold the compliance evidence.
  • Good faith. Under (i), good faith attempts by the committee to identify and correct quality deficiencies are not a basis for sanctions.
  • Patient safety organizations. If you use a PSO, Appendix PP warns that putting all evidence inside a protected system with no separate compliance record may leave you unable to demonstrate compliance.

Example wording (illustrative)

The current QAPI plan is maintained by the administrator in the survey readiness binder and the shared drive, and is presented to the State Survey Agency or Federal surveyor at each annual recertification survey and on request during any other survey. The facility maintains documentation and evidence of the ongoing program, including adverse event reports, data analysis, corrective action records, PIP files, and QAA minutes, and provides it on request to the extent it relates to compliance with 42 CFR 483.75.

8. Review and Update of the Plan

The review section sets when the plan is revisited and how changes are communicated. The regulation does not prescribe a review interval for the plan itself, but CMS’s how-to guide treats the plan as a living document reviewed at least annually, and after changes in services or resident population.

Source: CMS QAPI Written Plan How-To Guide (not in the regulation)

  • Review trigger. An annual date, plus events such as a new service line, a population change, a new facility assessment, or a survey finding.
  • Reviewer. The QAA committee reviews; the administrator ensures it happens.
  • Version control. A dated revision history so a surveyor can see the plan is maintained, not written once and shelved.
  • Communication. How revisions reach the governing body, staff, residents, and families.

Example wording (illustrative)

The QAA committee reviews this plan at least once a year, in [month], and whenever the facility assessment, services, or resident population change materially. Revisions are approved by the committee, dated in the revision log, and communicated to the governing body at its next meeting and to staff through department huddles and the staff bulletin.

Related guides: the root cause analysis guide for section 5, and infection preventionist requirements for section 6.

How the Eight Sections Map to the CMS How-To Guide

The CMS QAPI Written Plan How-To Guide has 22 numbered sections, and the eight sections in this template group them in regulation order. The table shows where each group sits in the guide so you can move between the two without losing a required topic.

Template sectionCMS how-to guide numbered sections
1. Purpose and ScopeSections 1 to 5: purpose, services, key issues, current QAA activities, best available evidence
2. Governance and LeadershipSections 6 to 11: responsibility and accountability, resourcing, training and orientation, framework, reporting to the governing body, fair and just culture
3. Feedback, Data Systems, and MonitoringSection 12: data sources to analyze performance, identify risk, and solicit feedback
4. Performance Improvement ProjectsSections 13 to 19: conducting PIPs, topics, prioritizing and selecting, charters, teams, conducting the PIP, documenting and communicating
5. Systematic Analysis and Systemic ActionSections 20 to 22: systematic approach, preventing future events and sustaining improvement, ensuring changes are implemented
6. QAA CommitteeNo dedicated section; closest are sections 6 and 10 on responsibility and reporting to the governing body
7. Documentation and DisclosureNo numbered section; the introduction says the plan is made available to a state agency, federal surveyor, or CMS on request
8. Review and UpdateNo numbered section; the introduction calls the plan a living document to review and revise

Section numbers checked against the November 2016 guide on cms.gov on 2026-11-25. Sections 1 to 22 are the guide's numbering, not regulation paragraphs.

PIP Charter Template: The Fields CMS Uses

A PIP charter template needs ten fields: project name, problem, background, goals, scope, time table, team roles, resources, barriers, and approval. These are the fields on CMS's charter worksheet, written here in our own words with an illustrative example row for each, so you can copy the structure and fill in your own facts.

Charter fieldWhat to writeIllustrative example
Name of projectA short label that names the process or outcome you are changing.Reduce falls with injury on [Unit]
Problem to be solvedOne or two sentences on what is going wrong, backed by your own data.Falls with injury on [Unit] rose over the last two quarters, above the facility benchmark.
BackgroundWhat led to the project: data trends, complaints, citations, or committee findings. Reference the source documents.QAA committee review of incident logs and resident council feedback in [month].
Goal(s)A measurable target with a number and a date.Reduce falls with injury on [Unit] by [X]% by [date].
ScopeWhere the project begins and ends: unit, shift, process, or population.Residents on [Unit], all shifts; excludes other units for this cycle.
Time tableStart and end dates for each phase: initiation, planning, implementation, monitoring, and closing.Planning [dates]; implementation [dates]; monitoring [dates]; closing report [date].
Team rolesWho is sponsor, director, and manager, plus other team members and the person assigned to each role.Sponsor: administrator. Manager: unit nurse manager. Members: aides, therapy, pharmacy.
ResourcesEquipment, software, supplies, and staff time the project needs.Staff release time for huddles; data pull from the incident system.
Barriers and responsesWhat could get in the way and what you will do about it.Staff assume more alarms mean fewer falls; share the data and test one change at a time.
ApprovalSignatures and dates from the administrator and the project sponsor, director, and manager.Administrator and sponsor sign and date before work begins.

CMS states that use of its worksheet is not mandated and that completing it does not ensure regulatory compliance. Fields checked against the CMS PIP charter worksheet on 2026-11-25. For a full worked charter, see performance improvement projects in nursing homes.

PIP Planning Worksheet: Three Questions

A PIP planning worksheet turns the charter into action by answering three questions: what you are trying to accomplish, how you will know a change is an improvement, and what changes you will make. A CMS-contracted Quality Improvement Organization publishes a worksheet built on these questions.

QuestionWhat the team records
What are you trying to accomplish?Restate the team's aim and list the overall steps in order or priority.
How will you know a change is an improvement?Pick simple measures, name the data source, and compare before and after the change.
What changes can you make that will result in improvement?List action steps, each with the person responsible, a completion date, and the outcome.

Source: QAPI Performance Improvement Planning Worksheet (Alliant Health Solutions, QIO; checked 2026-11-25). The wording above is ours.

Sample QAA Committee Meeting Agenda

A QAA committee agenda should walk the same items the regulation and Appendix PP assign to the committee: required attendance, infection prevention and Medical Director reports, data and drug regimen review, adverse events, PIPs, corrective action follow-up, and reporting upward. The agenda below is an illustration, not a CMS form.

  1. Attendance against the roster. Confirm the director of nursing, Medical Director or designee, infection preventionist, and leadership member are present or have a reporter.
  2. Minutes and open actions. Approve prior minutes and review each open action with owner and due date.
  3. Infection preventionist report. Appendix PP says reporting may cover surveillance, outbreaks and control measures, occupational illnesses, and antibiotic stewardship data.
  4. Medical Director report. Trends from oversight, including irregularities reported from medication regimen review.
  5. Indicator and dashboard review. Data from the plan’s data table against benchmarks and thresholds, including drug regimen review data.
  6. Adverse events and incidents. Patterns, root cause analyses opened or closed, and preventive actions.
  7. Active PIPs. Run chart, milestone status, barriers, and any decision needed.
  8. Corrective action monitoring. Whether performance goals are being met, and revisions where they are not.
  9. Feedback and new topics. Resident, family, and staff input; candidate PIP topics ranked by risk, volume, and problem-proneness.
  10. Governing body report. What will be reported and who presents it.
  11. Plan maintenance. Any trigger for revising the written plan, then actions, owners, and the next meeting date.

Record decisions, owners, and dates in the minutes; they are the evidence that the committee developed and implemented plans of action. Our QAPI coordinator job description shows who usually prepares the packet.

How to Write Your Facility’s QAPI Plan in Six Steps

Writing a QAPI plan takes six steps: start from the facility assessment, draft the eight sections in regulation order, name owners and cadences, attach the written policies, get committee approval with a date, and store the plan where it can be produced on request.

  1. Start from the facility assessment. Starting from the facility assessment means listing every service, unit, and population the plan must cover. Appendix PP says to tailor the plan to the units, programs, departments, and resident population identified there, so a generic plan copied from another building fails that test.
  2. Draft the eight sections in regulation order. Drafting in regulation order means one section for each of the purpose and scope, governance, data systems, PIPs, systemic action, committee, disclosure, and review. A surveyor can then match each paragraph of 42 CFR 483.75 to a page of your plan without hunting.
  3. Name owners, cadences, and thresholds. Naming owners and cadences means every task has a role, a frequency, and a measure. Use roles instead of people’s names where you can, so the plan survives turnover, which paragraph (f)(2) specifically requires the program to withstand.
  4. Attach the written policies and the data table. Attaching policies means linking the written feedback, data, and adverse event policies that paragraph (c) requires, plus the data source table. Keep the plan itself short and put detailed procedures in attachments that can be updated without rewriting the plan.
  5. Review, approve, and date it. Approval means the QAA committee reviews the draft, the governing body is told, and the version and date are recorded in the minutes. A dated approval shows the plan is maintained, not just written for the survey.
  6. Store it where it can be produced on request. Storing it where it can be produced means a known location, a named person, and a printed or electronic copy ready within minutes. The regulation requires presenting the plan at each annual recertification survey and on request during any other survey.

How Surveyors Test the Plan: F865, F867, and F868

Surveyors test the plan under three tags. F865 covers the program, the plan, documentation, and governance; F867 covers the activities in paragraphs (c), (d), and (e); F868 covers committee makeup, meetings, and reporting. F866 is now a stub, because Appendix PP relocated 483.75(c) to F867. Surveyors review QAPI at the end of the survey.

TagWhat it coversNoncompliance is generally shown when the facility failed to
F865QAPI program and plan, documentation, plan presentation, governance and leadership, disclosure of records.No documentation or evidence of the ongoing program; plan not presented on request; evidence of compliance not provided; no effective, comprehensive program for the full range of services; no governing body oversight.
F867Feedback, data systems and monitoring, adverse events, priorities, corrective action, PIPs, data review.Missing policies for feedback, data, indicators, or adverse events; no priorities on high-risk, high-volume, or problem-prone areas; no action plans; success not measured; no annual PIP; data not reviewed or acted on.
F868QAA committee composition, meeting frequency, and reporting to the governing body.No committee; missing required members; no report to the governing body; fewer than quarterly meetings or too few to carry out required QAPI work.

Appendix PP also says a facility that identified an issue through its QAA committee and made a good faith attempt to correct it will not be cited for QAA on that issue, though other tags may still apply. Surveyors may not use QAPI documents to find new concerns. See most-cited F-tags and what an F-tag is.

What to Have Ready When Surveyors Ask for the Plan

Have the current plan, the committee roster, dated minutes, written policies, trend data, PIP files, and governing body reports ready to hand over. The regulation requires presenting the plan on request, and Appendix PP expects documentation proving the program is implemented, not just written.

  • The current written plan. Signed or dated, with its revision history.
  • Committee roster. Each required role mapped to a named person and, where used, the Medical Director’s designee.
  • Dated minutes and attendance. Showing the infection preventionist reported and the Medical Director’s awareness was recorded.
  • Written policies. Feedback, data collection, performance indicators, and adverse event monitoring.
  • Data and trend reports. Indicator results over time, including drug regimen review data.
  • PIP files. Charter, baseline, root cause analysis, PDSA records, and monitoring for at least the annual project.
  • Governing body reporting. Evidence that the committee reported its activities.

Keep these in one place using the survey day evidence binder, test them in a mock survey, and work through the survey readiness checklist.

Common QAPI Plan Deficiencies

The common QAPI plan deficiencies are a plan that cannot be produced, a generic plan, missing written policies, no annual PIP, an incomplete or under-meeting committee, and no reporting to the governing body. Each maps to a key element of noncompliance in Appendix PP.

  • No written plan to present. Appendix PP lists failure to present the plan to surveyors during recertification or on request as a key element of F865 noncompliance.
  • A generic, untailored plan. A plan that never mentions the facility’s own units, programs, or population does not reflect the tailoring Appendix PP expects.
  • A plan with no evidence behind it. F865 also covers failing to maintain documentation that the program is operating, not only the plan itself.
  • Missing policies for paragraph (c). F867 covers not having written procedures for feedback, data collection, performance indicators, or adverse event tracking.
  • No annual PIP. F867 lists failure to conduct at least one PIP each year on a high-risk or problem-prone area identified from data.
  • Incomplete committee. F868 covers a committee missing a required member, including an infection preventionist who does not take part.
  • Too few meetings. F868 covers meeting less than quarterly or too seldom to do the required work.
  • No governing body report. Both F865 and F868 cite weak oversight and missing reporting to the governing body.
  • Action plans that stall. F867 covers a committee that did not develop and implement action plans or did not measure whether improvements were sustained.

If a citation lands, structure the response with the plan of correction examples and keep the QAPI side of it consistent with the written plan.

Tools for Keeping the Plan and Its Evidence Together

You can keep a QAPI plan in a word processor, a shared drive, or software, as long as the current version, committee records, data, and PIP files are dated and retrievable in minutes. CMS does not require any specific tool or format for the plan.

Keep QAPI evidence in one place

PoC360’s QAPI Module is built to run PIPs and PDSA cycles and to keep QAPI records ready for survey. To compare approaches first, read our QA and QAPI software guide and the policy and procedure library guide.

Sign up for PoC360 →

Official Sources for the QAPI Written Plan

The official sources are the QAPI regulation at 42 CFR 483.75, the interpretive guidance for F865, F867, and F868 in Appendix PP of the State Operations Manual, and CMS’s QAPI Written Plan How-To Guide and PIP charter worksheet, all hosted on cms.gov or ecfr.gov.

Frequently Asked Questions About the QAPI Plan

The questions below cover what administrators ask most about the written QAPI plan: whether it is required, whether CMS provides a template, how often to review it, who sits on the committee, and what surveyors can see.

Does a nursing home need a written QAPI plan?+

Yes. Appendix PP says the facility is required to develop a QAPI plan, defined as the written plan containing the process that guides its efforts to keep care at acceptable levels and improve it continually. Under 42 CFR 483.75(a)(3), it must be presented at each annual recertification survey and on request during other surveys.

Is there an official CMS QAPI plan template?+

CMS hosts the QAPI Written Plan How-To Guide, created by Lake Superior Quality Innovation Network and dated November 2016. It gives numbered sections, descriptions, and sample wording. The guide states its use is not mandatory and does not guarantee compliance, so treat it as a model and adapt it to your own facility assessment.

How often must the QAPI plan be reviewed?+

The regulation sets no review interval for the plan itself. The CMS how-to guide suggests the QAA committee review it at least annually and revise it as needed, calling it a living document. Many facilities also review it after a new facility assessment, a change in services, or a survey finding, and record the date.

Who has to be on the QAA committee?+

Under 42 CFR 483.75(g)(1), the committee needs the director of nursing, the Medical Director or designee, an infection preventionist, and at least three other staff, one of whom is the administrator, owner, a board member, or another leader. It must meet at least quarterly, and Appendix PP says the Medical Director’s designee cannot be another required member such as the DON.

What is the difference between a QAPI plan and a PIP charter?+

The QAPI plan is the facility-wide written document that describes how the whole program runs. A PIP charter covers one improvement project, setting its goal, scope, timetable, team, and approvals. CMS says its charter worksheet is not mandated. A plan names how charters are used; each charter then serves a single project.

Must we give surveyors our QAA committee minutes?+

Only to the extent they show compliance. Section 483.75(h) limits what a State or the Secretary may require, and Appendix PP says protected committee documents such as minutes must still be shown if they contain the evidence needed to determine compliance. Incident reports, wound logs, and infection control logs used to track adverse events are not protected.

How many PIPs must a nursing home do each year?+

Under 42 CFR 483.75(e)(3), the number and frequency of distinct performance improvement projects must reflect the scope and complexity of the facility's services and its resources, as shown in the facility assessment. At least once a year, one project must focus on a high-risk or problem-prone area found through the facility's own data. The regulation sets no other fixed number.

Which F-tags cover the QAPI plan?+

F865 covers the QAPI program and plan, documentation, governance, and disclosure. F867 covers feedback, data, adverse events, corrective action, and performance improvement projects. F868 covers the QAA committee’s membership, meeting frequency, and reporting. Appendix PP says surveyors use the QAPI and QAA facility task pathway, completed near the end of the survey.

Do we send the QAPI plan to the state?+

Not routinely. Paragraph (a)(2) required presenting the plan to the State Survey Agency within one year after the regulation was promulgated, which is long past. The ongoing requirement in (a)(3) is to present the plan to a State Survey Agency or Federal surveyor at each annual recertification survey, on request during other surveys, and to CMS on request.

Sources: 42 CFR 483.75 (eCFR, checked 2026-11-25); CMS State Operations Manual Appendix PP Rev. 232 (issued 07-23-25; latest Appendix PP revision as of 2026-11-25), F865 (last revised Rev. 211), F866 (stub, with 483.75(c) relocated to F867), F867 (Rev. 229) and F868 (Rev. 225); CMS QAPI Written Plan How-To Guide (Lake Superior Quality Innovation Network, November 2016); CMS Worksheet to Create a Performance Improvement Project Charter. Sample wording is illustrative. This article is general information, not legal advice. Last reviewed 2026-11-25.